
1/16/2012
9
Inspect the Instrument’s Plumbing
• P
lumbing should be clean and free of salt and
biological deposits.
– Clean/replace as necessary.
• Ensure the hole in the air bleed valve is open.
– Use a piece of 26 awg wire.
• Make sure all plumbing connections are properly
tie-wrapped.
– DO NOT tie-wrap to the conductivity cell.
• Examine the conductivity cell for damage.
Comentários a estes Manuais